Skip to content
naulon
Not checkedNot checked for notices yet.

A project management investigative framework establishing links for better project outcomes

Siriram, Rajenlall

South African Journal of Industrial Engineering · 2019

doi:10.7166/30-2-2064 (opens in a new tab)

We email you when a new notice or a question about this paper appears.

Abstract

This paper makes a contribution to knowledge by proposing a project management (PM) investigative framework with seven constructs and 60 sub-scales. The research consisted of an eight- step process. First, a project management assessment (PMA) tool was developed through an extensive literature review. Second, the PMA tool was evaluated through an expert panel. Third, the PMA tool was used to evaluate 330 projects, producing 330 PMA results. Fourth, an investigative framework linking the different PMA constructs was developed and tested. Structural equation modelling (SEM) was used to find links in the investigative framework for each of the PMA constructs, and 19 hypotheses were tested, all of which were accepted. The results provide interesting lessons for researchers and for project management practitioners. Finally, a discussion of the results, the study’s limitations, and suggestions for further research are presented.

Abstract licence: CC BY

References49

    49 more references, whose wording the paper’s licence keeps private.

    Reads

    Read by people on this page

    None yet.

    Checked or read by AI through naulon

    None yet.

    A person counts once a day per paper. We keep no cookie and no address: a reader is a hash that changes every day. Any month under five reads shows no number.

    Are you an author?

    Is this your paper?

    Claim it to add your note and be paid when agents cite it. Free.