Skip to content
naulon
Not checkedNot checked for notices yet.

A single machine multi-job integer batch scheduling problem with multi due date to minimize total actual flow time

Yusriski, Rinto, Astuti, Budi, Biksono, Damawijaya and 1 more

Decision Science Letters · 2021

doi:10.5267/j.dsl.2021.4.002 (opens in a new tab)

We email you when a new notice or a question about this paper appears.

Abstract

This research deals with a multi-job Integer batch scheduling problem on a single machine with different due dates. Every job demanded one or more parts, and the single machine processed the job into a number of batches. The objective is to minimize total actual flow time, defined as the total flow time of all jobs starting from the arrival to the common due date. The decisions are to determine the sequence of jobs, the number of batches, batch size, and sequence of all batches on a single machine. This research proposes three algorithms, developed based on the longest due date rule (The P1-LDD Algorithm), the adjacent pairwise interchange method (The P2-API Algorithm), and the permutation method (The P3-PM Algorithm). The numerical experience shows that the three algorithms produce an outstanding solution. The P1-LDD Algorithm fits to solve a simple problem. The P2-API Algorithm has superior to solve a big complicated problem. The P3-PM Algorithm has the best performance to solve small complicated problems.

Abstract licence: CC BY

References18

    18 more references, whose wording the paper’s licence keeps private.

    Reads

    Read by people on this page

    None yet.

    Checked or read by AI through naulon

    None yet.

    A person counts once a day per paper. We keep no cookie and no address: a reader is a hash that changes every day. Any month under five reads shows no number.

    Are you an author?

    Is this your paper?

    Claim it to add your note and be paid when agents cite it. Free.