Skip to content
naulon
Not checkedNot checked for notices yet.

Comparison of heuristics for an economic lot scheduling problem with deliberated coproduction

Pilar I. Vidal-Carreras, Jose P. Garcia-Sabater

Journal of Industrial Engineering and Management · 2009

doi:10.3926/jiem..v2n3.p437-463 (opens in a new tab)

We email you when a new notice or a question about this paper appears.

Abstract

<p style="text-align: justify" class="MsoNormal">We built on the Economic Lot Scheduling Problem Scheduling (ELSP) literature by making some modifications in order to introduce new constraints which had not been thoroughly studied with a view to simulating specific real situations. Specifically, our aim is to propose and simulate different scheduling policies for a new ELSP variant: Deliberated Coproduction. This problem comprises a product system in an ELSP environment in which we may choose if more than one product can be produced on the machine at a given time. We expressly consider the option of coproducing two products whose demand is not substitutable. In order to draw conclusions, a simulation model and its results were developed in the article by employing modified Bomberger data which include two items that could be produced simultaneously.</p>

Abstract licence: CC BY

Reads

Read by people on this page

None yet.

Checked or read by AI through naulon

None yet.

A person counts once a day per paper. We keep no cookie and no address: a reader is a hash that changes every day. Any month under five reads shows no number.

Are you an author?

Is this your paper?

Claim it to add your note and be paid when agents cite it. Free.