Conceptual cost estimations using neuro-fuzzy and multi-factor evaluation methods for building projects
Wei-Chih Wang, Tymur Bilozerov, Ren-Jye Dzeng and 2 more
Journal of Civil Engineering and Management · 2017
doi:10.3846/13923730.2014.948908 (opens in a new tab)
We email you when a new notice or a question about this paper appears.
Abstract
During the conceptual phase of a construction project, numerous uncertainties make accurate cost estimation challenging. This work develops a new model to calculate conceptual costs of building projects for effective cost control. The proposed model integrates four mathematical techniques (sub-models), namely, (1) the component ratios sub-model, (2) fuzzy adaptive learning control network (FALCON) and fast messy genetic algorithm (fmGA) based sub-model, (3) regression sub-model, and (4) multi-factor evaluation sub-model. While the FALCON- and fmGA-based sub-model trains the historical cost data, three other sub-models assess the inputs systematically to estimate the cost of a new project. This study also closely examines the behavior of the proposed model by evaluating two modified models without considering fmGA and undertaking sensitivity analysis. Evaluation results indicate that, with the ability to more thoroughly respond to the project characteristics, the proposed model has a high probability of increasing estimation accuracies more than the three conventional methods, i.e., average unit cost, component ratios, and linear regression methods.
Abstract licence: CC BY
Reads
Read by people on this page
None yet.
Checked or read by AI through naulon
None yet.
A person counts once a day per paper. We keep no cookie and no address: a reader is a hash that changes every day. Any month under five reads shows no number.
Are you an author?
Is this your paper?
Claim it to add your note and be paid when agents cite it. Free.