Effect of risk on economic efficiency of overcladding system

Ewa Marcinkowska, Mariusz Rejment

Journal of Civil Engineering and Management · 2006

doi:10.3846/13923730.2006.9636399 (opens in a new tab)

We email you when a new notice or a question about this paper appears.

Abstract

When a decision is taken about assembling an overcladding system on building external walls, an expected profit is calculated according to the economic discounting formulae. However, these formulae do not take into account the unplanned repair costs. The unplanned repairs have to be done to remove the defects which appear on a building wall overcladding during its service life. In order to do that the authors have performed the expert's surveys of technical condition of the existing overcladdings. These overcladdings were assembled on the external walls of 497 apartment buildings located in Wrocław (Poland) in 1990.2000. The qualitative results of technical condition expert's surveys, their transformation into the quantitative values done according to the elaborated model and estimation of the risk related to the expected profit decrease are presented in the article.

Abstract licence: CC BY

References7

    7 more references, whose wording the paper’s licence keeps private.

    Reads

    Read by people on this page

    None yet.

    Checked or read by AI through naulon

    None yet.

    A person counts once a day per paper. We keep no cookie and no address: a reader is a hash that changes every day. Any month under five reads shows no number.

    Are you an author?

    Is this your paper?

    Claim it to add your note and be paid when agents cite it. Free.