Skip to content
naulon
Not checkedNot checked for notices yet.

Sizing and Siting of Battery Energy Storage Systems: A Colombian Case

Alvaro Avendano Pena, David Romero-Quete, Camilo A. Cortes

Journal of Modern Power Systems and Clean Energy · 2022

doi:10.35833/mpce.2021.000237 (opens in a new tab)

We email you when a new notice or a question about this paper appears.

Abstract

This paper presents a mixed-integer linear programming (MILP) formulation for sizing and siting of battery energy storage systems (BESSs). The problem formulation seeks to minimize both operation costs and BESS investment. The proposed model includes restrictions of the conventional security-constrained unit commitment problem, a piece-wise linear approximation to model power losses, and a linear model of hydro generation units. The proposed model is tested in a 6-bus test system and a 15-bus system representing the Colombian power system. For the two studied systems, simulation results show that the reduction of operation costs due to the installation of BESSs compensates the investments, under some of the considered technical cost cases. Additionally, results show that adequate sizing and siting of BESSs reduce renewable energy curtailment in the Colombian power system with high penetration of fluctuating renewable generation.

Abstract licence: CC BY-NC-ND

Reads

Read by people on this page

None yet.

Checked or read by AI through naulon

None yet.

A person counts once a day per paper. We keep no cookie and no address: a reader is a hash that changes every day. Any month under five reads shows no number.

Are you an author?

Is this your paper?

Claim it to add your note and be paid when agents cite it. Free.