Skip to content
naulon
Not checkedNot checked for notices yet.

Fuzzy Byproduct Gas Scheduling in the Steel Plant Considering Uncertainty and Risk Analysis

Xueying Sun, Zhuo Wang, Jingtao Hu

Energies · 2018

doi:10.3390/en11102727 (opens in a new tab)

We email you when a new notice or a question about this paper appears.

Abstract

In the iron and steel enterprises, efficient utilization of byproduct gas is of great significance for energy conservation and emission reduction. This work presents a fuzzy optimal scheduling model for byproduct gas system. Compared with previous work, uncertainties in byproduct gas systems are taken into consideration. In our model, uncertain factors in byproduct systems are described by fuzzy variables and gasholder level constraints are formulated as fuzzy chance constraints. The economy and reliability of byproduct gas system scheduling are sensitive to different confidence levels. To provide a reference for operators to determine a proper confidence level, the risk cost is defined to quantify the risk of byproduct gas shortage and emission during the scheduling process. The best confidence level is determined through the trade-off between operation cost and risk cost. The experiment results demonstrated that the proposed method can reduce the risk and give a more reasonable optimal scheduling scheme compared with deterministic optimal scheduling.

Abstract licence: CC BY

References19

    19 more references, whose wording the paper’s licence keeps private.

    Reads

    Read by people on this page

    None yet.

    Checked or read by AI through naulon

    None yet.

    A person counts once a day per paper. We keep no cookie and no address: a reader is a hash that changes every day. Any month under five reads shows no number.

    Are you an author?

    Is this your paper?

    Claim it to add your note and be paid when agents cite it. Free.