Making Formwork Design Lean

Chien-Ho Ko, Jiun-De Kuo

Journal of Engineering, Project, and Production Management · 2019

doi:10.2478/jeppm-2019-0005 (opens in a new tab)

We email you when a new notice or a question about this paper appears.

Abstract

Traditional formwork design processes entail considerable waste, increasing non-value-adding manpower costs and operational time. The purpose of this research is to use lean thinking in formwork design so as to enhance design correctness and eliminate waste through establishing a Lean Formwork Design Process. In the design process, the concurrent design concept is adopted to provide a visual communication platform for design team members using Building Information Modeling (BIM). Industry Foundation Classes (IFC) are used as a protocol for sharing design artifacts. Design correctness is established to review and correct design errors, thus allowing for the construction of an organizational learning environment. Finally, the Lean Formwork Design Process is conceptualized using stock-flow diagrams. A real case is used to validate the applicability of the proposed approach. Application results show that the proposed method can enhance design correctness and reduce manpower waste and operational time in formwork engineering. This study is one of the first to apply lean thinking to improve practices in formwork design.

Abstract licence: CC BY-NC-ND

Reads

Read by people on this page

None yet.

Checked or read by AI through naulon

None yet.

A person counts once a day per paper. We keep no cookie and no address: a reader is a hash that changes every day. Any month under five reads shows no number.

Are you an author?

Is this your paper?

Claim it to add your note and be paid when agents cite it. Free.