Optimisation of production machine scheduling using a two level mixed optimisation method
Anil Rana Commander, Verma Ajit, Srividya A.S.
Yugoslav Journal of Operations Research · 2010
doi:10.2298/yjor1002197a (opens in a new tab)
We email you when a new notice or a question about this paper appears.
Abstract
This paper presents an application of a two level mixed optimization method on a machine scheduling problem of a government owned machine shop. Where evolutionary algorithm methods are suitable for solving complex, discrete space, and non-linear, discontinuous optimization problems; classical direct-search optimization methods are suitable and efficient in handling simple unimodal problems requiring less computation. Both methods are used at two levels, the first level decides which machines to be used for the machining operations and how much overtime (at extra cost) to be allotted to each work order, the second level decides for which operation and on which day the overtime should be allotted so as to attain its maximum benefit. A sample problem has been solved by using the above methods and a range of non-dominated solutions have been presented in a tabular form to enable the production manager to choose his options based on the given criticality of the work order.
Abstract licence: CC BY-NC-SA
Reads
Read by people on this page
None yet.
Checked or read by AI through naulon
None yet.
A person counts once a day per paper. We keep no cookie and no address: a reader is a hash that changes every day. Any month under five reads shows no number.
Are you an author?
Is this your paper?
Claim it to add your note and be paid when agents cite it. Free.