Skip to content
naulon
Not checkedNot checked for notices yet.

Achieving optimal design of the production line with obtainable resource capacity

Chen Miao-Sheng, Lan Chun-Hsiung

Yugoslav Journal of Operations Research · 2002

doi:10.2298/yjor0202203c (opens in a new tab)

We email you when a new notice or a question about this paper appears.

Abstract

The Maximal Profit Model for reaching an optimal design of the production line undergoing the limitations of obtainable resources is presented in this paper. This model is treated as an integer programming problem, and an efficient step-by-step algorithm to solve this problem is also constructed. In addition, it is discussed that the operation cost of a machine does not include idle and breakdown situations while the maintenance cost for a broken machine should be considered. This study offers a better tool for achieving the optimal design of a flexible production line and reveals the special applicability of the shortest path in production line design.

Abstract licence: CC BY-NC-SA

References8

    8 more references, whose wording the paper’s licence keeps private.

    Reads

    Read by people on this page

    None yet.

    Checked or read by AI through naulon

    None yet.

    A person counts once a day per paper. We keep no cookie and no address: a reader is a hash that changes every day. Any month under five reads shows no number.

    Are you an author?

    Is this your paper?

    Claim it to add your note and be paid when agents cite it. Free.