Not checkedNot checked for notices yet.
An Integrated Approach for Facility Location and Supply Vessel Planning with Time Windows
Mohsen Amiri, Seyed Jafar Sadjadi, Reza Tavakkoli-Moghaddam and 1 more
Journal of Optimization in Industrial Engineering · 2019
doi:10.22094/joie.2018.544109.1517 (opens in a new tab)
We email you when a new notice or a question about this paper appears.
Abstract
This paper presents a new model of two-echelon periodic supply vessel planning problem with time windows mix of facility location (PSVPTWMFL-2E) in an offshore oil and gas industry. The new mixed-integer nonlinear programming (MINLP) modelconsists ofa fleet composition problem and a location-routing problem (LRP). The aim of the model is to determine the size and type of large vessels in the first echelon and supply vessels in the second echelon.Additionally,the location of warehouse(s),optimal voyages and related schedules in both echelons are purposed.The total cost should be kept at a minimum and the need of operation regions and offshore installationsshould be fulfilled.A two-stage exact solution method, which is common for maritime transportation problems, is presented for small and medium-sized problems. In the first stage, all voyages are generated and in the second stage, optimal fleet composition, voyages and schedules are determined. Furthermore, optimal onshore base(s) to install central warehouse(s)and optimal operation region(s) to send offshore installation’s needs are decided in the second stage.
Abstract licence: CC BY-NC
Reads
Read by people on this page
None yet.
Checked or read by AI through naulon
None yet.
A person counts once a day per paper. We keep no cookie and no address: a reader is a hash that changes every day. Any month under five reads shows no number.
Are you an author?
Is this your paper?
Claim it to add your note and be paid when agents cite it. Free.