No-idle time Scheduling of Open shops: Modeling and Meta-heuristic Solution Methods
Bahman Naderi, Vahid Roshanaei
International Journal of Supply and Operations Management · 2014
doi:10.22034/2014.1.04 (opens in a new tab)
We email you when a new notice or a question about this paper appears.
Abstract
In some industries as foundries, it is not technically feasible to interrupt a processor between jobs. This restriction gives rise to a scheduling problem called no-idle scheduling. This paper deals with scheduling of no-idle open shops to minimize maximum completion time of jobs, called makespan. The problem is first mathematically formulated by three different mixed integer linear programming models. Since open shop scheduling problems are NP-hard, only small instances can be solved to optimality using these models. Thus, to solve large instances, two meta-heuristics based on simulated annealing and genetic algorithms are developed. A complete numerical experiment is conducted and the developed models and algorithms are compared. The results show that genetic algorithm outperforms simulated annealing.
Abstract licence: CC BY-NC-SA
Reads
Read by people on this page
None yet.
Checked or read by AI through naulon
None yet.
A person counts once a day per paper. We keep no cookie and no address: a reader is a hash that changes every day. Any month under five reads shows no number.
Are you an author?
Is this your paper?
Claim it to add your note and be paid when agents cite it. Free.