Not checkedNot checked for notices yet.
Analisis Manajemen Risiko Pelaksanaan Pembangunan Jalan Tol (Studi Kasus: Proyek Pembangunan Jalan Tol Bekasi - Cawang - Kampung Melayu)
Nia Rahmawati, Andi Tenrisukki Tenriajeng
Rekayasa Sipil · 2020
doi:10.21776/ub.rekayasasipil.2020.014.01.3 (opens in a new tab)
We email you when a new notice or a question about this paper appears.
Abstract
Construction of highway will increase the economy but it can’t be separated from risks. The purpose of this study is to analyze the risks at the stage of the implementation of highway construction and suggest mitigation to minimize the negative impact. Data were collected through interviews, brainstorming and questionnaires as well as previous research. The risk variable passed the validity and reliability test, then Descriptive Analysis and Analytical Hierarchy Process to get the most dominant risk. The number of identified risks are 49 risks divided into 10 aspects. Based on the result of analysis, the most dominant risk in aspect: 1)Politics:change of structure in government; 2)Environment: land acquisition; 3)Economy: owner’s late payment; 4)Finance:high overhead; 5)Nature: weather delay; 6)Project: material delivery delay; 7)Human: fatigue caused overtime; 8)Technical: nonconformity of volume in contract and reality; 9)Criminal: loss of materials and equipment; 10)Safety: lack of worker awareness. Then the dominant risk will be mitigated.
Abstract licence: CC BY
References1
1 more reference, whose wording the paper’s licence keeps private.
Reads
Read by people on this page
None yet.
Checked or read by AI through naulon
None yet.
A person counts once a day per paper. We keep no cookie and no address: a reader is a hash that changes every day. Any month under five reads shows no number.
Are you an author?
Is this your paper?
Claim it to add your note and be paid when agents cite it. Free.