Prediksi Beban Listrik Menggunakan Algoritma Jaringan Syaraf Tiruan Tipe Propagasi-Balik
Ramadoni Syahputra, Febrian Dhimas Syahfitra, Karisma Trinanda Putra and 1 more
Semesta Teknika · 2020
doi:10.18196/st.v23i2.9940 (opens in a new tab)
We email you when a new notice or a question about this paper appears.
Abstract
Artikel ini mengusulkan prediksi beban puncak menggunakan metode jaringan syaraf tiruan tipe propagasi-balik. Prediksi beban puncak transformator tenaga merupakan tugas penting dalam mengantisipasi pertumbuhan beban listrik di masa mendatang. Prediksi yang tepat dan akurat akan memfasilitasi perencanaan kapasitas pembangkit listrik yang memadai pada waktu yang tepat. Metode jaringan syaraf tiruan tipe propagasi-balik memiliki akurasi yang baik dalam tugas-tugas prediksi. Pada penelitian ini dilakukan prediksi beban puncak pada dua buah transformator tenaga dengan studi kasus di Gardu Induk Bumiayu, Brebes, Jawa Tengah, Indonesia. Parameter pelatihan adalah data pertumbuhan penduduk, produk domestik regional bruto (PDRB), dan data beban puncak selama sepuluh tahun terakhir. Hasil penelitian menunjukkan bahwa kedua unit transformator tenaga tersebut masih dapat melayani beban listrik di wilayah pelayanan Gardu Induk Bumiayu selama sepuluh tahun ke depan. This article proposes a peak load prediction using the backpropagation neural network method. Predicting the peak load of power transformers is an important task in anticipating load growth in the future. Precise and accurate predictions will facilitate the planning of sufficient power generation capacity at the right time. The backpropagation type neural network method has good accuracy in the prediction task. In this study, a case study was carried out by predicting the peak load of power transformers at Bumiayu Substation, Brebes, Central Java, Indonesia. Training parameters consists of population growth data, gross regional domestic product (GRDP), and peak load data for the last ten years. The results showed that the two power transformer units could still serve the electricity load in the Bumiayu substation service area for the next ten years.
Abstract licence: CC BY
Reads
Read by people on this page
None yet.
Checked or read by AI through naulon
None yet.
A person counts once a day per paper. We keep no cookie and no address: a reader is a hash that changes every day. Any month under five reads shows no number.
Are you an author?
Is this your paper?
Claim it to add your note and be paid when agents cite it. Free.