Skip to content
naulon
Not checkedNot checked for notices yet.

Productivity improvement for heating ventilation and air conditioning unit assembly

Vichai Rungreunganun, Teansin Sriwasut

Songklanakarin Journal of Science and Technology (SJST) · 2018

doi:10.14456/sjst-psu.2018.23 (opens in a new tab)

We email you when a new notice or a question about this paper appears.

Abstract

The objective of this research was to improve the productivity for the air conditioner unit of for car manufacturers. The target production volume of the air conditioner unit was greater than 46 pieces per hour. The current capacity was insufficient, so the researchers studied the problems using a study of the assembly standard time. The study found the assembly line bottleneck standard time was 1.64 minutes per piece, representing a yield of 36 pieces per hour. The labor productivity was 1.84 pieces per person per hour. The operation two-hand chart and operation area check sheet analysis was applied to find the operations that should be improved because the standard time was over the takt time. After that the Eliminate, Combine, Rearrange, Simplify (ECRS) technique was used to propose a method for process improvement. After improvement, the bottleneck was 1.28 minutes per piece which represented a yield of 46.9 pieces per hour. The labor production rate was equivalent to 2.35 pieces per hour or an increase of 27.1%.

Abstract licence: CC BY-NC

Reads

Read by people on this page

None yet.

Checked or read by AI through naulon

None yet.

A person counts once a day per paper. We keep no cookie and no address: a reader is a hash that changes every day. Any month under five reads shows no number.

Are you an author?

Is this your paper?

Claim it to add your note and be paid when agents cite it. Free.