Optimization of HVAC coordination with use of BIM
Tomas Katolicky, Robert Bouska
Business & IT · 2020
doi:10.14311/bit.2020.03.07 (opens in a new tab)
We email you when a new notice or a question about this paper appears.
Abstract
The article deals with the optimization of HVAC design coordination using building information modeling (BIM). The aim is to identify and compare ways of coordination in construction projects and to evaluate BIM method for clash detection. This method is verified by clash detection of HVAC design in practice using the BIM tool Trimble Connect. 3D clashes are detected between different project models according to selected parameters. The result is a quick and accurate identification of clashes. Timely solution prevents cost increases and schedule shifts of the construction project.
Abstract licence: CC BY
Reads
Read by people on this page
None yet.
Checked or read by AI through naulon
None yet.
A person counts once a day per paper. We keep no cookie and no address: a reader is a hash that changes every day. Any month under five reads shows no number.
Are you an author?
Is this your paper?
Claim it to add your note and be paid when agents cite it. Free.