Enhancing operational efficiency through overall equipment efficiency optimization and Kaizen initiatives.
Abu M Fuad, Nusra Akter Takia, Hasin Ahmad Zafir and 1 more
PLoS ONE · 2025
doi:10.1371/journal.pone.0320761 (opens in a new tab)
We email you when a new notice or a question about this paper appears.
Abstract
This case study aims to investigate the causes of low efficiency in a carton production line by calculating Overall Equipment Effectiveness (OEE). A typical carton factory has been chosen for this study, which has two production lines, namely finished goods and corrugated boards. The define, measure, analyze, improve, and control approach is applied while implementing Six Sigma principles such as Kaizen, fishbone diagrams, and 5W+1H as its systematic procedure. The analysis involves estimating four machines' average OEE across 12 shifts. A cost-effective method is applied to resolve the problems that cause the lines to be less efficient. By applying the proposed method, the OEE becomes more efficient by 29% for finished goods and 9% for corrugated boards. Value stream mapping has been used to track the improvements. It is found that emphasizing higher OEE values enhances operational performance, leading to better efficiency, power usage, cycle time, and equipment repair.
Abstract licence: CC BY
Reads
Read by people on this page
None yet.
Checked or read by AI through naulon
None yet.
A person counts once a day per paper. We keep no cookie and no address: a reader is a hash that changes every day. Any month under five reads shows no number.
Are you an author?
Is this your paper?
Claim it to add your note and be paid when agents cite it. Free.