Skip to content
naulon
Not checkedNot checked for notices yet.

A dispatching method for the lots of different priorities in 450-mm semiconductor manufacturing

CN Wang, Jing-Wein Wang, Min-Tsong Chou and 2 more

Advances in Mechanical Engineering · 2017

doi:10.1177/1687814017713945 (opens in a new tab)

We email you when a new notice or a question about this paper appears.

Abstract

Semiconductor industry grows rapidly in recent years. It has an impact on the economies all over the world. For the mass production requirement, the wafer size starts to be increased from 300 to 450 mm. The technician cannot handle a large number of wafers since the size and weight of the wafers are increased. The automated material handling system has become the basic requirements of the wafer factory, and it is important to provide on-time delivery service and shorten cycle time to meet customer demand for different priority products. Hence, this study proposed an effective conveyor dispatching rule, which can reduce the handling delay of hot lots and detect the dispatching of lots with different priorities. The simulation experiments were conducted by building a 450-mm manufacturing environment and compared the nearest job first with conveyor dispatching rule. The results are sound. The conveyor dispatching rule can reduce 97.57% of the total average delivery variable time of hot lots and 0.28% of normal lots. This study proves that conveyor dispatching rule can efficiently improve productivity and reduce the cycle time of hot lots in every load configuration.

Abstract licence: CC BY

Reads

Read by people on this page

None yet.

Checked or read by AI through naulon

None yet.

A person counts once a day per paper. We keep no cookie and no address: a reader is a hash that changes every day. Any month under five reads shows no number.

Are you an author?

Is this your paper?

Claim it to add your note and be paid when agents cite it. Free.