Neural Network-Based Model for Predicting Preliminary Construction Cost as Part of Cost Predicting System
Diana Car-Pusic, Silvana Petruseva, Valentina Zileska Pancovska and 1 more
Advances in Civil Engineering · 2020
doi:10.1155/2020/8886170 (opens in a new tab)
We email you when a new notice or a question about this paper appears.
Abstract
A model for early construction cost prediction is useful for all construction project participants. This paper presents a combination of process‐based and data‐driven model for construction cost prediction in early project phases. Bromilow’s “time‐cost” model is used as process‐based model and general regression neural network (GRNN) as data‐driven model. GRNN gave the most accurate prediction among three prediction models using neural networks which were applied, with the mean absolute percentage error (MAPE) of about 0.73% and the coefficient of determination R 2 of 99.55%. The correlation coefficient between the predicted and the actual values is 0.998. The model is designed as an integral part of the cost predicting system (CPS), whose role is to estimate project costs in the early stages. The obtained results are used as Cost Model (CM) input being both part of the Decision Support System (DSS) and part of the wider Building Management Information System (BMIS). The model can be useful for all project participants to predict construction cost in early project stage, especially in the phases of bidding and contracting when many factors, which can determine the construction project implementation, are yet unknown.
Abstract licence: CC BY
References42
42 more references, whose wording the paper’s licence keeps private.
Reads
Read by people on this page
None yet.
Checked or read by AI through naulon
None yet.
A person counts once a day per paper. We keep no cookie and no address: a reader is a hash that changes every day. Any month under five reads shows no number.
Are you an author?
Is this your paper?
Claim it to add your note and be paid when agents cite it. Free.