Skip to content
naulon

Not checkedNot checked for notices yet.

Electric short-term load forecast integrated method based on time-segment and improved MDSC-BP

Rui Wang, Shiwen Chen, Jing Lu

Systems Science & Control Engineering · 2021

doi:10.1080/21642583.2020.1843088 (opens in a new tab)

We email you when a new notice or a question about this paper appears.

Abstract

In this paper, an integrated forecast method is proposed based on multi-resources data, which improves the maximum deviation similarity criterion (MDSC) of time-segment BP neural network. The existing short-term load forecast methods for power systems will lead to the low accuracy or even failure of the load prediction method since the multi-stage load change and weather fluctuation factors are not considered. The improved similar day category screening method with the time-segment BP neural network model is employed to deal with the above problem in this paper, where a regional load characteristic law is used to divide the load into seven time periods such that a time-segment BP neural network model is proposed. Based on the feature vector and the real-time meteorological data of the forecast day, the trained forecast model can provide the load value of the forecast day and overcome the restriction of the historical load data. Meanwhile, the prediction accuracy and the training time are also improved under the fluctuating meteorological conditions. Finally, a load forecast of a certain area is given to show the prediction accuracy of different types of days can reach more than 96%,illustrate the effectiveness of the proposed methods.

Abstract licence: CC BY-NC

Reads

Read by people on this page

None yet.

Checked or read by AI through naulon

None yet.

A person counts once a day per paper. We keep no cookie and no address: a reader is a hash that changes every day. Any month under five reads shows no number.

Are you an author?

Is this your paper?

Claim it to add your note and be paid when agents cite it. Free.