Calculation of the auxiliary buffers time with regard to the robustness of the construction schedule to disruption

Połoński Mieczysław

MATEC Web of Conferences · 2019

doi:10.1051/matecconf/201926207011 (opens in a new tab)

We email you when a new notice or a question about this paper appears.

Abstract

The literature offers numerous proposals for calculating the project buffer, located at the end of the critical chain. However, the structure of construction schedules, often consisting of several dozen or several hundred tasks, requires planning a larger number of buffers, also located on the critical chain. The article proposes an original method of dividing the duration of one buffer located at the end of a protected chain (e.g. a project buffer) into several auxiliary buffers, protecting individual fragments of this path. The basis of the algorithm that calculates their size is to take into account the robust of protected task paths before the deadline for their completion is disrupted. As a measure of robust understood in this way, the ratio of the buffer size to the sum of the variance of the task duration of the protected draft was applied. The criterion of searching for the optimal time division into several buffers was to maximize the minimum robust of all analyzed paths. The application of the proposed optimization model is illustrated on the example of a specific construction schedule.

Abstract licence: CC BY

References9

    9 more references, whose wording the paper’s licence keeps private.

    Reads

    Read by people on this page

    None yet.

    Checked or read by AI through naulon

    None yet.

    A person counts once a day per paper. We keep no cookie and no address: a reader is a hash that changes every day. Any month under five reads shows no number.

    Are you an author?

    Is this your paper?

    Claim it to add your note and be paid when agents cite it. Free.