Grid Study of Mini Hydro Power Plant (MHPP) of Palangai Hulu 2x4,9 MW South Pesisir
Hidayat, Cahayahati, Arnita and 1 more
MATEC Web of Conferences · 2018
doi:10.1051/matecconf/201824802003 (opens in a new tab)
We email you when a new notice or a question about this paper appears.
Abstract
This paper presents a gridd study of Mini Hydro Power Generation (MHPP) of Palangai Hulu, 2 x 4.9 MW. It is owned by PT. Dempo Sumber Energi (DSE) located at Palangai of South Pesisir Regency. The objective is to fulfill the legal aspects, technical aspects and economic aspects to develop of MHPP. The legal aspect is one of the requirements that must be fulfilled prior to the signing of Power Purchase Agreement (PPA) between DSE and State Electricity Company that called PLN. Technical aspect is to analyze the operational impact of the distribution system after MHPP connecting to the PLN distribution system, while the economic aspect is to analyze how much result energy of MHPP can be absorbed by PLN. Uultimately, it is described the financial feasibility of MHPP. The result is, legal aspect of development of MHPP of Palangai Hulu feasible to be continued to next process to sign contract of PPA. Technically, there is no negative impact of operating the PLN distribution system after the MHPP is connected to the PLN Rayon Balai Selasa system that analyzes using ETAP. Point of Connection (POC) as the selling point of electrical energy by DSE to the most economical PLN is on substation circuit of Balai Selasa. The energy production of MHPP Palangai Hulu can be absorbed 96.4% starting in 2018. The cost of POC is Rp. 11,577,000,000.
Abstract licence: CC BY
Reads
Read by people on this page
None yet.
Checked or read by AI through naulon
None yet.
A person counts once a day per paper. We keep no cookie and no address: a reader is a hash that changes every day. Any month under five reads shows no number.
Are you an author?
Is this your paper?
Claim it to add your note and be paid when agents cite it. Free.