Skip to content
naulon
Not checkedNot checked for notices yet.

Analysis of Changes of Forces and Normal Stress in Extradosed Tendons of the MS-3B Bridge Located on the Ring Road in Ostróda

Stefanowski Tadeusz, Supeł Piotr, Trochymiak Wojciech

MATEC Web of Conferences · 2018

doi:10.1051/matecconf/201819602050 (opens in a new tab)

We email you when a new notice or a question about this paper appears.

Abstract

The article discusses the analyses of a numerical model of an extradosed bridge built as part of the project called “Construction of S7 expressway connecting Miłomłyn and Olsztynek, together with construction of Ostróda Bypass as a section of national road no. 16.” The constructed facility fits in with the global trends of construction of next generation concrete bridges with tensioned tendons. The bridge is the best in its class in Europe in terms of the length of its main span. It is also one of the first concrete bridges in Poland which have been built using cantilever technology in which the extradosed tendons were stressed during construction process. The article contains, in particular, the selected results of the analyses related to changes of forces and normal stresses in extradosed tendons depending on live loads to which the bridge was exposed during the service phases, while accounting for environmental and rheological as well as passage of time.

Abstract licence: CC BY

Reads

Read by people on this page

None yet.

Checked or read by AI through naulon

None yet.

A person counts once a day per paper. We keep no cookie and no address: a reader is a hash that changes every day. Any month under five reads shows no number.

Are you an author?

Is this your paper?

Claim it to add your note and be paid when agents cite it. Free.