Skip to content
naulon
Not checkedNot checked for notices yet.

Energy savings achieved from recommissioning a research and development center

Huang Xinjiang, Liu Chenggang, Miao Yuyang

MATEC Web of Conferences · 2018

doi:10.1051/matecconf/201817504028 (opens in a new tab)

We email you when a new notice or a question about this paper appears.

Abstract

The recommissioning is performed for a research and development (R&D) center located in Suzhou. The hardware problems of Heating, Ventilation and Air Conditioning (HVAC) system and software problems of Electrical Monitoring and Control System (EMCS) were found. The recommissioning measures were generated and control logic in EMCS was optimized and improved. The saving of about 121kW for chilled water consumption, 181kW for hot water consumption and 1450 kWh/D for electricity consumption from recommissioning were achieved from recommissioning measures.

Abstract licence: CC BY

Reads

Read by people on this page

None yet.

Checked or read by AI through naulon

None yet.

A person counts once a day per paper. We keep no cookie and no address: a reader is a hash that changes every day. Any month under five reads shows no number.

Are you an author?

Is this your paper?

Claim it to add your note and be paid when agents cite it. Free.