Flexible prefabricated system moravamont 2000
Cuckič Živko P.
E3S Web of Conferences · 2020
doi:10.1051/e3sconf/202021202005 (opens in a new tab)
We email you when a new notice or a question about this paper appears.
Abstract
At the end of a decade-long research work at the Moravamont plant in Gnjilane, a new completely prefabricated building system was created from reinforced concrete and prestressed precast elements on the track, which was called Moravamont 2000. Presented in paper final results demonstrates that the construction is well and rationally designed, that the construction behaviour for the maximum expected earthquake effects with a return period of 500 years, according to the criterion of regulation, is resistant and resistant to an earthquake without major damage. The idea is to present through new system moravamont 2000 its flexible side along with the possible development using 3D technology.
Abstract licence: CC BY
Reads
Read by people on this page
None yet.
Checked or read by AI through naulon
None yet.
A person counts once a day per paper. We keep no cookie and no address: a reader is a hash that changes every day. Any month under five reads shows no number.
Are you an author?
Is this your paper?
Claim it to add your note and be paid when agents cite it. Free.