Optimize the cost of paying for electricity in the water supply system by using accumulating tanks
Kapanski Alexei, Hruntovich Nadezhda, Bakhur Siarhei and 2 more
E3S Web of Conferences · 2020
doi:10.1051/e3sconf/202017801065 (opens in a new tab)
We email you when a new notice or a question about this paper appears.
Abstract
The article considers the method of optimizing the pumps in the water supply system of the first water rise station in the zones of the day, where there is a different system of payment for electric energy. To assess the regulatory capacity of pumps on a temporary parameter, the authors of the article propose to use existing water tanks in the water supply system, which act as a buffer, smoothing the unevenness of water consumption. The studies have revealed that the comprehensive optimization of pumps on the criterion of minimizing specific electricity consumption by lifting water and optimizing the operation of pumps in the zones of the day allows to significantly improve energy efficiency and reduce the cost of extraction and transportation of water to the consumer. In the article, the authors examine an algorithm that allows us to assess the economic potential of pump regulation in the real-world conditions of the system.
Abstract licence: CC BY
Reads
Read by people on this page
None yet.
Checked or read by AI through naulon
None yet.
A person counts once a day per paper. We keep no cookie and no address: a reader is a hash that changes every day. Any month under five reads shows no number.
Are you an author?
Is this your paper?
Claim it to add your note and be paid when agents cite it. Free.