Choice of commutation device and development of the scheme of a universal sectionalizing point with automatic load transfer function for the 0.38 kV electric network

Vinogradov A. V., Vinogradova A. V., Ward M. O. and 3 more

E3S Web of Conferences · 2019

doi:10.1051/e3sconf/201912402011 (opens in a new tab)

We email you when a new notice or a question about this paper appears.

Abstract

The overestimated length of rural power lines of 0.38 kV leads to the fact that it is often not possible to fulfill both the sensitivity conditions of the protective device installed at the transformer substation and protecting the line from overloads and short circuits, and the requirements of the power supply reliability of consumers. This problem can be solved by installing in-line universal sectionalizing point equipped with an automatic load transfer function. The use of these devices allows dividing a line into sections provides the necessary sensitivity of protection for each section of the line and the possibility of supplying power to undamaged areas from a backup power source. In addition, only with the use of automated switching devices installed in power lines, it is possible to create intelligent electrical networks. When developing these devices, it is necessary to take into account the electromechanical characteristics of switching devices that are planned to be used for switching lines.

Abstract licence: CC BY

References4

    4 more references, whose wording the paper’s licence keeps private.

    Reads

    Read by people on this page

    None yet.

    Checked or read by AI through naulon

    None yet.

    A person counts once a day per paper. We keep no cookie and no address: a reader is a hash that changes every day. Any month under five reads shows no number.

    Are you an author?

    Is this your paper?

    Claim it to add your note and be paid when agents cite it. Free.