Stochastic scheduling of ground movement problem integrated with taxiway routing and gate/stand allocation
Yuanchao Yang, Zichen Gao
IET Intelligent Transport Systems · 2022
doi:10.1049/itr2.12192 (opens in a new tab)
We email you when a new notice or a question about this paper appears.
Abstract
Abstract The authors propose a new scheduling model and solution method for Ground Movement Problem (GMP) which is designed to manage the movements of flights on the surface of airport air‐side in an effective manner. Since the arrival time for arrival flights and off‐block time for departure flights are usually uncertain parameters for GMP, the proposed scheduling model is stochastic and integrates the three‐dimensional (3‐D) taxiway routes’ assignment (with variable taxiing speed for flights) and the gates/stands allocation for the flights, with fully capturing multiple constraints related to taxiways, gates/stands and aircraft performance limits. The solution method also provides a stochastic quantification scheme concerning both uncertainties by the arrival time and off‐block time information. The schedule results can realize the immunity of the above time uncertainties within a tolerable risk probability. We finally provide numerical analysis to verify the stochastic scheduling model with mixed integer and linear programming (MILP) basics and illustrate the effectiveness of proposed solution method by a test case on Hangzhou international airport in China.
Abstract licence: CC BY-ND
Reads
Read by people on this page
None yet.
Checked or read by AI through naulon
None yet.
A person counts once a day per paper. We keep no cookie and no address: a reader is a hash that changes every day. Any month under five reads shows no number.
Are you an author?
Is this your paper?
Claim it to add your note and be paid when agents cite it. Free.