Simulation of emergency evacuation from construction site of prefabricated buildings
Mufeng Xiao, Xihua Zhou, Xinxin Pan and 5 more
Scientific Reports · 2022
doi:10.1038/s41598-022-06211-w (opens in a new tab)
We email you when a new notice or a question about this paper appears.
Abstract
To ensure the safe construction of prefabricated buildings and improve the efficiency of the safe evacuation of construction personnel after a fire caused by improper operation during construction, this study used the PyroSim software to numerically simulate a fire situation based on the size and volume of a prefabricated building construction site. The variation rules of smoke visibility, CO concentration, and ambient temperature in the construction site of prefabricated buildings were analyzed and the available safe evacuation time was determined. Moreover, the Pathfinder software was used for simulation in combination with the physical attributes of personnel, evacuation speed, and personnel proportions. The time required for safe evacuation was determined and the factors influencing the evacuation time, such as the quantity and location of stacked prefabricated components, machinery, and appliances, and the number of on-site construction personnel, were analyzed. The data collected by the temperature sensor, CO concentration sensor, and visibility sensor reveal that the visibility and crash time are the key factors restricting the efficiency of personnel avoidance and evacuation. At 400 s, the visibility at the escape exit of the prefabricated apartment construction site was lower than 5 m. The crashing time of the building was 360 s, which is the critical point for casualties. The first emergency evacuation simulation took 398.7 s. The required safe evacuation time (T REST ) > available safe evacuation time (T ASET ), and the original site layout cannot facilitate the safe evacuation of all construction workers. The evacuation time can be effectively reduced by re-planning the stacking positions of prefabricated construction site components, construction equipment, and other items, and reducing the number of personnel in the construction plane. The results of the second simulation reveal that the safe evacuation time (T REST ) is 355.2 s. Because it is required that the safety evacuation time (T REST ) < available safe evacuation time (T ASET ), the results are in line with the emergency evacuation requirements. The findings of this study can provide a theoretical basis for the rational planning of evacuation passages at the construction sites of prefabricated buildings and assist the management of construction site safety.
Abstract licence: CC BY-NC-ND
References11
11 more references, whose wording the paper’s licence keeps private.
Reads
Read by people on this page
None yet.
Checked or read by AI through naulon
None yet.
A person counts once a day per paper. We keep no cookie and no address: a reader is a hash that changes every day. Any month under five reads shows no number.
Are you an author?
Is this your paper?
Claim it to add your note and be paid when agents cite it. Free.