Ecological resource potential
Harald Desing, Gregor Braun, Roland Hischier
MethodsX · 2020
doi:10.1016/j.mex.2020.101151 (opens in a new tab)
We email you when a new notice or a question about this paper appears.
Abstract
The ecological resource potential (ERP) method allows to calculate the amount of one material that can potentially be produced within Earth system boundaries, if no other anthropogenic activity would take place. It indicates the uppermost potential of one resource extracted, processed and disposed after use with a specific set of technologies and a defined probability of violating Earth system boundaries. This method is an adaption of the ecological resource availability (ERA) method, which calculates the amount of a resource that can be produced within an allocated share of the global boundaries, i.e. when considering all other anthropogenic activities. While more realistic, its allocation can be done in multiple ways and based on a variety of different objectives, which requires scenario modelling. The ERP method, in contrary, only requires information on environmental impacts from resource extraction, processing, and final disposal. The customization of the original ERA method comprises: • Omitting all steps for allocating global boundaries to single resources or resource segments. • Changing the calculation procedure so that ERP is calculated for each resource separately.
Abstract licence: CC BY-NC
Reads
Read by people on this page
None yet.
Checked or read by AI through naulon
None yet.
A person counts once a day per paper. We keep no cookie and no address: a reader is a hash that changes every day. Any month under five reads shows no number.
Are you an author?
Is this your paper?
Claim it to add your note and be paid when agents cite it. Free.