Skip to content
naulon
Not checkedNot checked for notices yet.

Full electromagnetic transient simulation for large power systems

Yong Tang, Lei Wan, Junxian Hou

Global Energy Interconnection · 2019

doi:10.1016/j.gloei.2019.06.004 (opens in a new tab)

We email you when a new notice or a question about this paper appears.

Abstract

For building Global Energy Interconnection (GEI), it is necessary to implement new breakthroughs on large- power system simulation. Key routes for implementing full electromagnetic transient simulation of large-power systems are described in this paper, and a top framework is designed. A combination of the new large time step algorithm and the traditional small-time step algorithm is proposed where both parts A and B are calculated independently. The method for integrating the Norton equivalence of the power electronic system to the entire power grid is proposed. A two-level gird division structure is proposed, which executes a multi-rate parallel calculation among subsystems and element parallel calculation in each subsystem. The initialization method of combining load flow derivation and automatic trial-and-error launching is introduced. The feasibility of the method is demonstrated through a practical power grid example, which lays a foundation for further research.

Abstract licence: CC BY-NC-ND

References15

    15 more references, whose wording the paper’s licence keeps private.

    Reads

    Read by people on this page

    None yet.

    Checked or read by AI through naulon

    None yet.

    A person counts once a day per paper. We keep no cookie and no address: a reader is a hash that changes every day. Any month under five reads shows no number.

    Are you an author?

    Is this your paper?

    Claim it to add your note and be paid when agents cite it. Free.