Pre-split blasting design to reduce costs and improve safety in underground mining
Alexander Pomasoncco-Najarro, Claudio Trujillo-Valerio, Luis Arauzo-Gallardo and 3 more
Energy Reports · 2022
doi:10.1016/j.egyr.2022.07.109 (opens in a new tab)
We email you when a new notice or a question about this paper appears.
Abstract
To control the overbreaking of an underground mining development gallery, the controlled blasting technique was proposed and as a result it was possible to reduce costs and improve the physical stability of the periphery of the opening, achieving greater safety for personnel and equipment. With the support of the geomechanical studies, the rock quality of the advancing front was determined, serving for the design of the drilling mesh and the choice and distribution of the explosives in the respective drills. This study demonstrates that it is possible to make progress in efficient mining preparation and development work, achieving minimal damage to the roof and walls of the mining work. Performing the simulation with the software determines a difference between conventional blasting with the design of the pre-cut technique, optimizing the parameters of the perforation mesh, selection of the explosive charge, the order of detonation. As a result, the study found a 60%–70% reduction in excess excavation, showing a better finish of the tunnel contour, yielding a 16% reduction in support costs.
Abstract licence: CC BY-NC
Reads
Read by people on this page
None yet.
Checked or read by AI through naulon
None yet.
A person counts once a day per paper. We keep no cookie and no address: a reader is a hash that changes every day. Any month under five reads shows no number.
Are you an author?
Is this your paper?
Claim it to add your note and be paid when agents cite it. Free.