DC to turnkey: An analysis of the balance of costs for behind the meter BESS at commercial/industrial sites
D. Roberts, S. Brown
Energy Reports · 2021
doi:10.1016/j.egyr.2021.02.060 (opens in a new tab)
We email you when a new notice or a question about this paper appears.
Abstract
Accurate estimation of the balance of costs required to deliver a turnkey battery energy storage system (BESS) is highly important for decision making on optimal battery type and sizing for a given project. Such costs can be greater than the direct current (DC) boundary module costs for short duration systems. Despite this, very little data is publicly available for such costs at the commercial/industrial scale, and data decomposed into $/kW, $/kWh and fixed components is even scarcer. In the present work, cost models reported by PNNL and Lazard are tested against cost instances reported by EPRI. As system duration increases the Lazard model increasingly overpredicts balance of costs, whereas the PNNL model increasingly underpredicts them. This is due to the former placing more costs in the $/kWh category. It is shown that averaging the PNNL and Lazard models gives better agreement with the EPRI data than either does alone (10% discrepancy compared to 36/30%). The disagreement in cost scaling requires further attention, as it currently hinders the study of longer duration systems.
Abstract licence: CC BY-NC
Reads
Read by people on this page
None yet.
Checked or read by AI through naulon
None yet.
A person counts once a day per paper. We keep no cookie and no address: a reader is a hash that changes every day. Any month under five reads shows no number.
Are you an author?
Is this your paper?
Claim it to add your note and be paid when agents cite it. Free.