Skip to content
naulon
Not checkedNot checked for notices yet.

Quantitative and qualitative analysis of construction and demolition waste in Yazd city, Iran

Mohsen Ansari, Mohammad Hassan Ehrampoush

Data in Brief · 2018

doi:10.1016/j.dib.2018.10.141 (opens in a new tab)

We email you when a new notice or a question about this paper appears.

Abstract

Construction and demolition waste is the major category of municipal solid waste that is important due to high volume and mass produced. Therefore, this study aims to analyze the quantitative and qualitative of construction and demolition waste in Yazd. This descriptive cross-sectional study was conducted on a waste disposal site in Yazd in 2017–2018. sampling of the construction and demolition waste disposal site was performed for 12 months (Jul 2017 to Jul 2018). According to a researcher-made checklist, data on the weight, the density and volume of these wastes were collected. The descriptive statistics tests of data were processed in Excel software. 53,445 t of waste are annually generated in Yazd that the amount of cement and concrete, bricks, tile and ceramic (TC), ferrous metals, non-ferrous metals, glass, plastic, wood, and are approximately 38%, 20%, 14%, 11%, 6%, 5%, 3%, and 3%, respectively. With regards to the high volume of waste generated and a remarkable part of the recyclable waste, urban planners should pay attention to the implementation of waste reduction and recycling programs. Keywords: Construction waste, Demolition waste, Waste composition

Abstract licence: CC BY-NC

Reads

Read by people on this page

None yet.

Checked or read by AI through naulon

None yet.

A person counts once a day per paper. We keep no cookie and no address: a reader is a hash that changes every day. Any month under five reads shows no number.

Are you an author?

Is this your paper?

Claim it to add your note and be paid when agents cite it. Free.