Techno-economic assessment of 10 MW centralised grid-tied solar photovoltaic system in Uganda
Ivan T. Oloya, Tar JL. Gutu, Muyiwa S. Adaramola
Case Studies in Thermal Engineering · 2021
doi:10.1016/j.csite.2021.100928 (opens in a new tab)
We email you when a new notice or a question about this paper appears.
Abstract
There is increasing interest in solar PV installations in Uganda, however, there is little or no information available on performance of solar PV systems in Uganda. Since solar PV performance is site specific, there is need to provide stakeholders with information that could help them in making informed decision. Therefore, this paper presents a performance analysis of a 10 MW solar-photovoltaic plant installed in Soroti City, in Eastern Uganda (latitude 1°N, longitude 33°E). Energy production data for this solar power plant over a 3-year period between January 2017 and December 2019 were collected and analysed using IEC standard 61724–1. It was found that the average annual energy generation by the plant is 16702 MWh and specific energy output of 1670.2 kWh/kW. Furthermore, the daily final yield, annual performance ratio, annual capacity factor and energy yield per unit area are found as 4.58 h/day, 75.84%, 19.07%, and 121.4 kWh/m2. respectively. Based on the assumption used in this study and approved feed-in tariff, the estimated discounted payback period (9.28 years), profitability index (1.51), and internal rate of return (10.55%) showed that it is economically viable. The estimated levelized cost of energy of US$ 0.1087/kWh, is within range of values reported for similar projects.
Abstract licence: CC BY-NC
References39
39 more references, whose wording the paper’s licence keeps private.
Reads
Read by people on this page
None yet.
Checked or read by AI through naulon
None yet.
A person counts once a day per paper. We keep no cookie and no address: a reader is a hash that changes every day. Any month under five reads shows no number.
Are you an author?
Is this your paper?
Claim it to add your note and be paid when agents cite it. Free.