Skip to content
naulon
Not checkedNot checked for notices yet.

LEDA Beam Operations Milestone and Observed Beam Transmission Characteristics

L. J. Rybarcyk, J. D. Schneider, H. V. Smith and 2 more

eConf C000821 (2000) TUD15 · 2000

We email you when a new notice or a question about this paper appears.

Abstract

Recently, the Low-Energy Demonstration Accelerator (LEDA) portion of the Accelerator Production of Tritium (APT) project reached its 100-mA, 8-hr CW beam operation milestone. LEDA consists of a 75-keV proton injector, 6.7-MeV, 350-MHz CW radio-frequency quadrupole (RFQ) with associated high-power and low-level rf systems, a short high-energy beam transport (HEBT) and high-power (670-kW CW) beam dump. During the commissioning phase it was discovered that the RFQ field level must to be approximately 5-10% higher than design in order to accelerate the full 100-mA beam with low losses. Measurements of a low-duty-factor, 100-mA beam show the beam transmission is unexpectedly low for RFQ field levels between ~90 and 105% of design. This paper will describe some aspects of LEDA operations critical to achieving the above milestone. Measurement and simulation results for reduced RFQ beam transmission near design operating conditions are also presented.

Abstract licence: CC0

Reads

Read by people on this page

None yet.

Checked or read by AI through naulon

None yet.

A person counts once a day per paper. We keep no cookie and no address: a reader is a hash that changes every day. Any month under five reads shows no number.

Are you an author?

Is this your paper?

Claim it to add your note and be paid when agents cite it. Free.